This Web site was designed using Web standards.
Learn more about the benefits of standardized design.

Quick Links

E-mail Article

District

Working...

Ajax Loading Image

 


 Story image 1_0
4ec56a1ad0f6e St. Francis High School Gymnasium
South wall
Installing pads on north wall
Removing the old padding
Removing the old padding
South wall
Admiring the work
South wall
North wall
St. Francis High School Gymnasium

Lookin' Good!

Several upgrades have been made in recent months to improve the school facility. The high school gymnasium received a new facelift. The floor was redone with a new paint scheme and a new finish. The new finish is a water-based product and will not "yellow" as the old finish did. New lights were also installed in the gymnasium. These lights can be turned off and on quickly as they do not need time to warm up or cool down. The old lights took several minutes to come on. The lights and new floor finish has made the gymnasium much brighter.


 Story image 2_0
4ec56a1ad0f6e Main entrance to high school
Northwest entrance
Circle drive entrance
Circle drive entrance
School viewed from west
School viewed from west
Main entrance to high school

New pads have been installed on the north and south gym walls replacing the old brown carpet and padding that had been there for years. The new pads provide increased safety for the athletes as well as enhance the appearance of the gymnasium.

New doors have been added at the high school. The doors match the windows that were installed last year and are much more energy efficient than the old school doors. The doors have thermal glass that prevents so much heat from entering or leaving the building and will not only improve the appearance of the building, but will also help with utility savings. There has been a noticeable difference in the temperature of the lower hallway on those hot and cold days since the doors were installed.


 Story image 3_0
4ec56a1ad0f6e Grade school hallway looking east
Grade school hallway looking west
Grade school hallway looking east

The lower school hallway in the elementary building has been refurbished with new lights, wiring, and new suspended ceiling.

Lookin' good!

Please click the photos to see more photos!

Sign up for the News Update.


Back To Top